403 Crockett St Bldg 2
New 3-story single family residence with 3 bedrooms and 2.5 bathrooms.
- Permit
- № 2026-132712
- Issued
- October 8, 2026
- Where
- 78704 · Zilker · Bouldin · South Lamar
Not on any permit · 17
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Fence & deck →
Fence companies aren't on the permit. The fence goes in near the end, before move-in, so call now to get on the bid list.
- Landscaping & irrigation →
Landscapers aren't on the permit. Sod, beds and irrigation go in at the end, usually 4-8 months in, so call now to get on the bid list.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Gutters →
The gutter installer isn't on the permit. Gutters go on near the end, after the roof and siding.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- Electrical →
No electrician is on file for this job yet.
- Plumbing →
No plumber is on file for this job yet.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderCatalyst ATX
More open jobs in 78704 · Zilker · Bouldin · South Lamar
- 1606 Valleyridge DrTotal demolition of single-family home built in 1970.Needs Dumpsters & site services
- 2811 Rock Terrace DrTotal demolition of detached single story garage.Needs Dumpsters & site services
- 2104 Wilson StNew 3-story single family residence with 3 bedrooms, 2.5 bathrooms, and attached garage.Needs Roofing, Fence & deck, Landscaping & irrigation
- 2100 Wilson StNew construction of a 3-story single family residence with 3 bedrooms, 2.5 bathrooms, and attached garage.Needs Roofing, Fence & deck, Landscaping & irrigation
- 517 Bouldin Ave Bldg 1New autofill heated pool.Needs Fence & deck, Landscaping & irrigation, Pool service
- 1602 Valleyridge DrTotal demolition of single-family residence from circa 1970.Needs Dumpsters & site services