8507 Bargamin Dr
Addition and remodel extending dining room and remodel of kitchen.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
- Call
- Consolidated Hospitality Services · (512) ***-0294
- Value
- $5k
Slabs, driveways, walks and pool decks pour first, and no flatwork contractor is ever on the permit. Fortific sends you every new home, addition and pool the morning after the city issues it, so you call the builder before the pour is on the schedule.
$49/month after the trial · no contract · cancel in two clicks
Addition of mud room to existing residence.
Foundation work is the first trade on site. If you're not calling the week of the permit, you're too late.
Builders pour the slab with one company and often bid the drive, walks and patio separately, later. Nobody tells you when.
Every new pool needs decking and coping, and pool builders sub it out.
Only permits under 60 days old. Slabs pour first, so that's your window.
New pools come with the pool builder's phone, for decks, coping and the walk to the house.
Job value on each lead, so you can tell a 1,600 sq ft starter home from a 6,000 sq ft custom slab.
Real permits Austin issued in the last seven days that need concrete. Phone numbers are partly hidden here; subscribers get them in full, every morning.
Addition and remodel extending dining room and remodel of kitchen.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
New construction of parking garage.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
Porch enclosure remodel on residential property.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
New 2-story single-family residence.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
New construction of commercial parking garage.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
New autofill and heated pool installation.
A new pool needs decking and coping around it.
Top ZIP codes this week. Single Trade covers up to 10 ZIPs you pick.
$171M+ in permitted work this week where concrete is still open
Austin publishes every permit it issues. We pull the full feed each morning, so nothing slips past.
Each permit is decoded into plain English and checked against every sub-permit on the job, so we know which contractors are named and which trades it still needs.
Only new builds, additions and pools under 60 days old in your ZIP codes, with the builder's phone, before the pour.
permit_type_desc: Building Permitpermit_number: 2026-123801 BPpermit_class: R- 434 Addition & Alterationswork_class: Addition and Remodelpermit_location: 7005 BENT OAK CIRdescription: Additionissue_date: 2026-09-22T00:00:00.000original_zip: 78749contractor_trade: General Contractorcontractor_company_name: McAngus Construction Company, LLCcontractor_phone: (512) ***-7855
Addition of mud room to existing residence.
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
Illustrative jobs built from the kinds of permits Austin issues every week. The ZIPs and job types are real; the live leads above are the actual permits.
Drives, walks and patios on every new home in your ZIPs, with the builder's phone.
Pick concrete and the west-side ZIPs where pools get built. Call the pool builder the week of the permit.
Use fresh new-build permits to get on the schedules of builders you haven't poured for yet.
Single Trade is $49 a month. A typical concrete job in Austin is $12,000. You don’t need every lead to work. You need one, now and then.
210 Austin jobs needed concrete in the last seven days.
Based on the $49/month Single Trade plan. Margins are an example; plug in your own job size.
Month to month. No setup fee, no per-lead charges. Cancel anytime from any email.
For owner-operators who work one trade in one part of town.
Concrete & flatwork + up to 10 ZIP codes
For crews and suppliers that cover all of Austin.
Add more trades or the whole metro
Permit lists sort by the trade on the permit, which is the one trade the job doesn’t need. Fortific sorts by the trades it still has to hire.
| Feature | Fortific | Typical permit list |
|---|---|---|
| Sorted by | Jobs that still need concrete | The trade on the permit (already sold) |
| Checks every sub-permit on the job | ✓ | — |
| One-line reason it's your lead | ✓ | — |
| Builder name and phone | When the city lists it | Sometimes |
| Owner mailing address for follow-on work | ✓ | — |
| Plain-English job description | ✓ | Raw city codes |
| Delivered | Email by 7am + CSV | Log in and search |
| Price | $49/month, cancel anytime | Often priced per lead or per seat |
No. The building permit comes first, then the foundation. That's why we only send permits under 60 days old: you're calling while the pour is being scheduled.
Yes. Every new pool needs decking and coping. Pool leads come with the pool builder's phone.
Foundation repair permits are already sold to a foundation company, so they aren't concrete leads. They're sent to painters and supply companies, who work after them.
Every lead comes straight from a permit the city issued, checked against every sub-permit on the same job, so we know who's already named. The "why" line tells you exactly which rule made it a lead. The job value and contractor phone are whatever the city recorded; when the city left them blank, so do we.
No phone numbers. Most leads are the contractor running the job, with their phone when the city lists it, which is most of the time. For work that follows a job, like a fence after a new pool, you get the owner of record and their mailing address from the Travis Central Appraisal District's public tax roll, ready for a mailer, plus whether they live there and when they bought. Owners who've had the appraisal district keep their records confidential are never included.
Most lists sort permits by the trade on the permit, so a roofer gets a list of roofs other roofers already sold. We sort by the trades the job still needs. We check every sub-permit filed for the job so we never send you one where your trade is already named, and every lead says in one line why it's yours.
Yes. Building permits and the appraisal roll are public records, and calling a contractor about work on their job is ordinary business. Owner records are for mail outreach only, which you agree to in our terms, and we remove any owner who asks. You're responsible for following do-not-call and anti-solicitation rules where they apply.
Yes. It's month to month with a 14-day free trial and no contract. Cancel or update your card anytime from the link in any digest email.
Austin is first. Travis and Williamson county suburbs are next, followed by San Antonio, Dallas and Houston.
Start your free trial tonight, pick your ZIP codes, and tomorrow's concrete leads arrive by 7am. No charge for 14 days.
See real Austin leads first