500 E 3rd St
New construction of Austin Convention Center Area 3.
- Permit
- № 2026-137245
- Issued
- October 19, 2026
- Where
- 78701 · Downtown
- Declared value
- $812,383,209
Not on any permit · 13
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Landscaping & irrigation →
Landscapers aren't on the permit. Sod, beds and irrigation go in at the end, usually 4-8 months in, so call now to get on the bid list.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderJE Dunn Construction ***MAIN***
- ElectricianPrism Electric Inc
- PlumberThe Porter Co.
More open jobs in 78701 · Downtown
- 98 San Jacinto Blvd Unit Fsr2406Interior remodel of condo kitchen area.Needs Drywall & insulation, Cabinets & countertops, Painting
- 1801 N Lamar Blvd Unit Flr1Interior remodel of existing office space on floors 1.Needs Drywall & insulation, Painting, Flooring & tile
- 200 W 6th St Unit Flr21Remodel existing admin shell for multi-tenant corridor on floor 21.Needs Drywall & insulation, Painting, Flooring & tile
- 1801 N Lamar Blvd Unit Flr2Interior remodel of existing offices major remodel floor 2.Needs Drywall & insulation, Painting, Flooring & tile
- 301 Congress AveInterior non-structural demolition.Needs Dumpsters & site services
- 1801 N Lamar Blvd Unit Flr3Interior remodel of existing offices major remodel floor 3.Needs Drywall & insulation, Painting, Flooring & tile