3204 Nancy Gale Dr
Construction of a new inlaw suite attached to main home.
- Permit
- № 2026-133227
- Issued
- October 9, 2026
- Where
- 78735 · Barton Creek
- Declared value
- $150,000
Not on any permit · 14
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- Electrical →
No electrician is on file for this job yet.
- Plumbing →
No plumber is on file for this job yet.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderLFM Development Inc.
More open jobs in 78735 · Barton Creek
- 5720 Kempson DrTear off and replace existing shingle roof with impact-resistant shingles and replace damaged roof decking as needed.Needs Gutters, Solar & batteries, Dumpsters & site services
- 6121 Blue Stem TrlConnect mobile home with 4x4 deck addition.Needs Roofing, Drywall & insulation, Cabinets & countertops
- 6101 Blue Stem TrlConnect mobile home with 4x4 deck addition.Needs Roofing, Drywall & insulation, Cabinets & countertops
- 7601 Southwest Pkwy Bldg 1Phase 1 interior remodel to existing floor 2 of building 1.Needs Drywall & insulation, Painting, Flooring & tile
- 7171 Southwest Pkwy Bldg B200100 kva UPS sub-panels and receptacles installation.Needs Solar & batteries
- 7171 Southwest Pkwy Bldg B100Central UPS systems upgrade with replacement of UPS units, sub-panels, and receptacles for building server rooms.Needs Solar & batteries