1902 Justin Ln Unit B
Convert the covered patio and porch on unit B to conditioned space, adding 310 square feet.
- Permit
- № 2026-131796
- Issued
- October 7, 2026
- Where
- 78757 · Allandale · Crestview
Not on any permit · 14
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- Electrical →
No electrician is on file for this job yet.
- Plumbing →
No plumber is on file for this job yet.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderNuhorizon Remodeling
More open jobs in 78757 · Allandale · Crestview
- 8303 Stillwood LnRelocate meter and service equipment from rear to garage side with new service mast and subpanel.Needs Solar & batteries
- 1806 Cullen AveInterior bathroom remodel with shower conversion, new vanity, pony walls, and electrical outlet relocation.Needs Drywall & insulation, Cabinets & countertops, Painting
- 2504 Cascade DrInstall Tesla wall connector from panel through attic and into garage location.Needs Solar & batteries
- 8313 Weyburn DrFoundation repair for residential property.Needs Painting, Building materials & supply
- 2014 Karen Ave Bldg 3New in-ground swimming pool construction.Needs Fence & deck, Landscaping & irrigation, Pool service
- 2014 Karen Ave Bldg 2New swimming pool construction.Needs Fence & deck, Landscaping & irrigation, Pool service