13220 Wolf Thorn Dr
New 1-story single-family residence condominium with 3 bedrooms, 2 bathrooms, attached 2-car garage and covered entry porch.
- Permit
- № 2026-128551
- Issued
- October 1, 2026
- Where
- 78652 · Manchaca
Still to hire · 17
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file.
- Fence & deck →
New homes usually need a fence before move-in.
- Landscaping & irrigation →
New builds need sod, beds and irrigation before final inspection.
- Drywall & insulation →
Insulation and drywall go in after rough-in, and neither is on the permit.
- Cabinets & countertops →
New kitchens and baths need cabinets and tops, and no cabinet shop is on the permit.
- Framing & carpentry →
Framing is never on an Austin permit, so the builder still has to line up a crew.
- Concrete & flatwork →
Slab, driveway and walks pour first. Reach the builder before the pour is scheduled.
- Gutters →
New homes need gutters, and the installer isn't on the permit.
- Painting →
Every new wall gets painted, and painters never pull a permit.
- Flooring & tile →
Flooring and tile aren't permitted, so whoever installs them isn't on file.
- Windows & doors →
Windows and exterior doors get ordered early. Bid before framing tops out.
- Electrical →
No electrician is on file for this job yet.
- Plumbing →
No plumber is on file for this job yet.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Every new build gets a final clean before the certificate of occupancy.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- Builder