520 E 6th St
Addition of a new awning to shell building.
- Permit
- № 2026-123042
- Issued
- October 7, 2026
- Where
- 78701 · Downtown
Not on any permit · 14
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- Electrical →
No electrician is on file for this job yet.
- Plumbing →
No plumber is on file for this job yet.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderZapalac/Reed (MAIN) Construction Company
More open jobs in 78701 · Downtown
- 218 E 6th StInterior structural repair with no change in use, height or area and no exterior work.Needs Drywall & insulation, Painting, Flooring & tile
- 723 E 6th StAddition of a new awning to shell building.Needs Roofing, Drywall & insulation, Cabinets & countertops
- 500 E 6th StRepair of existing exterior stair to make code compliant and provide a second means of egress for future second floor tenant.Needs Drywall & insulation, Painting, Flooring & tile
- 500 E 6th StDemolition of non-historic rear addition and plumbing upgrades for shell building with stubbed and capped pipes.Needs Plumbing, Dumpsters & site services
- 1210 San Antonio StInterior remodel to existing office building, phase 6A, 4th floor outdoor trellis.Needs Drywall & insulation, Painting, Flooring & tile
- 500 W 2nd St Unit 2300Interior remodel to existing admin areas to create lab space.Needs Drywall & insulation, Painting, Flooring & tile