9504 Glenlake Dr
Partial demolition, addition and interior remodel to two-story single family residence with new deck and bathrooms.
- Permit
- № 2026-104566
- Issued
- October 12, 2026
- Where
- 78730 · River Place
Not on any permit · 14
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- Electrical →
No electrician is on file for this job yet.
- Plumbing →
No plumber is on file for this job yet.
- HVAC →
No HVAC contractor is on file for this job yet.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderMAK Construction LLC
More open jobs in 78730 · River Place
- 6307 West Courtyard DrNew pool and spa construction.Needs Fence & deck, Landscaping & irrigation, Concrete & flatwork
- 5312 China Garden DrKitchen remodel with new layout, pantry, laundry, and like-for-like windows.Needs Drywall & insulation, Cabinets & countertops, Painting
- 7901 Fm 2222 RdQuikTrip retaining wall new construction.Needs Painting, Building materials & supply
- 5000 Bluffton CvInstallation of electrical for EV charger in garage.Needs Solar & batteries
- 6300 Bridge Point Pkwy Bldg 1 Unit 200Interior remodel of existing office space with demolition of finishes and mechanical, electrical, and plumbing work as shown on plans.Needs Drywall & insulation, Painting, Flooring & tile
- 6701 N Fm 620 Rd Bldg 4Emergency replacement of main distribution breaker panel affecting 21 residential units due to breaker failure.Needs Solar & batteries