219 Lessin Ln Bldg 5
New 2-story condominium with 2 bedrooms, 2.5 bathrooms, 1 attached garage, uncovered parking, and covered entry porch.
- Permit
- № 2022-064758
- Issued
- November 5, 2026
- Where
- 78704 · Zilker · Bouldin · South Lamar
- Declared value
- $331,200
Not on any permit · 14
- Roofing →
Roofing on new construction isn't permitted separately, so no roofer is on file. It's usually picked while framing goes up.
- Fence & deck →
Fence companies aren't on the permit. The fence goes in near the end, before move-in, so call now to get on the bid list.
- Landscaping & irrigation →
Landscapers aren't on the permit. Sod, beds and irrigation go in at the end, usually 4-8 months in, so call now to get on the bid list.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Framing & carpentry →
Framing is never on an Austin permit. It's usually awarded in the first few weeks, so call now.
- Concrete & flatwork →
Concrete subs aren't on Austin permits. The slab pours first, so reach the builder before it's scheduled.
- Gutters →
The gutter installer isn't on the permit. Gutters go on near the end, after the roof and siding.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Windows & doors →
Window suppliers aren't on the permit. Windows and exterior doors get ordered early, so bid before framing tops out.
- Dumpsters & site services →
Active site: roll-offs, porta-johns and temp fence from day one.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderHoch Construction LLC.(MAIN)
- HVACHoch Construction LLC
- PlumberMustang Plumbing
- ElectricianHoch Construction LLC.(MAIN)
More open jobs in 78704 · Zilker · Bouldin · South Lamar
- 2324 S Lamar Blvd Unit 100Change of use from retail to food sales with interior remodel to create retail matcha and cafe.Needs Drywall & insulation, Painting, Flooring & tile
- 103 W Milton StInterior remodel of existing retail space including new storefront and new ADA restroom with 1481 SF.Needs Drywall & insulation, Painting, Flooring & tile
- 219 Lessin Ln Bldg 7New 2-story duplex condominium with 2 bedrooms, 2.5 bathrooms, attached garage, and covered carport.Needs Roofing, Fence & deck, Landscaping & irrigation
- 2323 S Lamar Blvd Unit 134First generation tenant improvement for proposed gym use.Needs Drywall & insulation, Painting, Flooring & tile
- 2011 Oxford AveNew swimming pool in backyard of existing residence.Needs Fence & deck, Landscaping & irrigation, Concrete & flatwork
- 1100 S Lamar BlvdGas test and repair for pool area at Lamar Union apartment complex.Needs Fence & deck, Landscaping & irrigation