606 Gaylor St
New construction of 2-story 2-bedroom 2.5-bathroom dwelling unit with attached carport, porch and balcony.
- Permit
- № 2025-157616
- Issued
- July 27, 2026
- Where
- 78752 · Highland
Not on any permit · 9
The building permit is over 60 days old, so the early trades (framing, slab, roof, windows) are likely hired.
- Fence & deck →
Fence companies aren't on the permit. The fence goes in near the end, before move-in, so call now to get on the bid list.
- Landscaping & irrigation →
Landscapers aren't on the permit. Sod, beds and irrigation go in at the end, usually 4-8 months in, so call now to get on the bid list.
- Drywall & insulation →
Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.
- Cabinets & countertops →
No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.
- Gutters →
The gutter installer isn't on the permit. Gutters go on near the end, after the roof and siding.
- Painting →
Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.
- Flooring & tile →
Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.
- Construction cleanup →
Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.
- Building materials & supply →
Active job with materials still to buy.
Named on the permit
Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.
- BuilderTrue Insight CS
- HVACChristopher Woods
- ElectricianIES Residential, Inc.
- PlumberIES Residential Inc