New building shell construction for an office use building with 4385 SF.

Permit
№ 2026-017568
Issued
February 17, 2026
Where
78744 · Southeast · Franklin Park

Not on any permit · 7

The building permit is over 60 days old, so the early trades (framing, slab, roof, windows) are likely hired.

  • Landscaping & irrigation →

    Landscapers aren't on the permit. Sod, beds and irrigation go in at the end, usually 4-8 months in, so call now to get on the bid list.

  • Drywall & insulation →

    Drywall and insulation are never on the permit. They're usually bid 1-3 months in, while framing goes up, so call now to get on the bid list.

  • Cabinets & countertops →

    No cabinet shop is ever on the permit. Cabinets are usually ordered 1-2 months in for lead time, so call early.

  • Painting →

    Painters never pull a permit. Paint is usually bid 2-4 months in, after drywall, so call now to get on the bid list.

  • Flooring & tile →

    Flooring and tile aren't permitted, so no installer is on file. Usually picked 2-4 months in, so call now to get on the bid list.

  • Construction cleanup →

    Cleaning crews aren't on the permit. The final clean comes right before the certificate of occupancy, months out, so call now to get on the list.

  • Building materials & supply →

    Active job with materials still to buy.

Named on the permit

Austin names the builder and the licensed trades. Everyone else the job needs is hired by the builder.

  • BuilderRISE Collective, LLC
  • DSRise Collective, LLC
  • HVACJMAG Enterprises LLC
  • ElectricianPerry Electrical Services
  • PlumberCKW Plumbing